A 189 Septic Electrical Final is an inspection done for the septic electrical panel. This would be a building inspection because the Building Division is involved with the electrical and plumbing for projects. The tank and leach lines go to Well and Septic Division.
Please open a building (BLD) permit and schedule a 189 Septic Electrical inspection.