My septic inspector told me that I need a 189 inspection to finalize my building permit. Do I go through Well & Septic for this?

Answer

A 189 Septic Electrical Final is an inspection done for the septic electrical panel. This would be a building inspection because the Building Division is involved with the electrical and plumbing for projects. The tank and leach lines go to Well and Septic Division.

Please open a building (BLD) permit and schedule a 189 Septic Electrical inspection.